Extension of time

Extension of Time (EOT) Claim Consultant, UAE

Contractor-side extension-of-time support under FIDIC and NEC — a programme-based, contract-compliant time case that survives the Engineer’s or Project Manager’s scrutiny. EOT is won on the programme and the records, not on assertion, and liquidated-damages exposure is defended the same way.

When to call us

  • An EOT has been rejected or under-awarded
  • Liquidated-damages or delay-damage exposure is building
  • The programme does not actually support the time case
  • There is a concurrent-delay argument to deal with
  • Acceleration is being claimed by you or imposed on you

What this covers

  • 01 Time-impact and as-built delay analysis
  • 02 Critical-path narrative tied to the records
  • 03 Methodology aligned to the contract requirement
  • 04 Prolongation cost and thickening
  • 05 Liquidated-damages defence
  • 06 Concurrency, mitigation and acceleration

How we work

Founder-led: direct senior input, no junior hand-off. We do not provide legal advice — we lead the commercial, contractual-administration and quantum position alongside your legal advisers, and bring in specialist planners, delay analysts or quantum experts where a matter requires them.

Speak to Craig.

A confidential 30-minute conversation, no charge and no obligation. Send the issue and you’ll get an honest view on whether and how the firm can help.