Extension of time
Extension of Time (EOT) Claim Consultant, UAE
Contractor-side extension-of-time support under FIDIC and NEC — a programme-based, contract-compliant time case that survives the Engineer’s or Project Manager’s scrutiny. EOT is won on the programme and the records, not on assertion, and liquidated-damages exposure is defended the same way.
When to call us
- ◆An EOT has been rejected or under-awarded
- ◆Liquidated-damages or delay-damage exposure is building
- ◆The programme does not actually support the time case
- ◆There is a concurrent-delay argument to deal with
- ◆Acceleration is being claimed by you or imposed on you
What this covers
- 01 Time-impact and as-built delay analysis
- 02 Critical-path narrative tied to the records
- 03 Methodology aligned to the contract requirement
- 04 Prolongation cost and thickening
- 05 Liquidated-damages defence
- 06 Concurrency, mitigation and acceleration
How we work
Founder-led: direct senior input, no junior hand-off. We do not provide legal advice — we lead the commercial, contractual-administration and quantum position alongside your legal advisers, and bring in specialist planners, delay analysts or quantum experts where a matter requires them.
Speak to Craig.
A confidential 30-minute conversation, no charge and no obligation. Send the issue and you’ll get an honest view on whether and how the firm can help.