← All specialist areas

FIDIC claims

FIDIC Claims Consultant in Dubai

Contractor-side help with claims under FIDIC Red, Yellow, Silver and Emerald — Sub-Clause 20.2 notices, fully detailed claims, extension of time, variation valuation, Engineer’s determinations and DAAB preparation. The Gulf runs on FIDIC, almost always heavily amended by the Particular Conditions, and entitlement is won or lost on whether your notice and records discipline matches what those amendments actually require.

When to call us

  • The Engineer has rejected, or is sitting on, a claim
  • A Sub-Clause 20.2.1 notice window is about to close
  • An instruction is a variation in all but name, labelled a “clarification”
  • A determination under Sub-Clause 3.7 / 3.5 has gone against you
  • A DAAB referral is looming and the commercial case needs building
  • The Particular Conditions have shortened your notice windows

What this covers

  • 01 Sub-Clause 20.2 notice strategy and drafting under time-bar pressure
  • 02 Cause–effect–evidence claim packaging that survives scrutiny
  • 03 Extension of time and prolongation
  • 04 Variation valuation under Clause 13
  • 05 Engineer’s determination response and challenge
  • 06 DAAB submission preparation alongside your legal team

How we work

Founder-led: direct senior input, no junior hand-off. We do not provide legal advice — we lead the commercial, contractual-administration and quantum position alongside your legal advisers, and bring in specialist planners, delay analysts or quantum experts where a matter requires them.

Speak to Craig.

A confidential 30-minute conversation, no charge and no obligation. Send the issue and you’ll get an honest view on whether and how the firm can help.